KAWO renovation of a DN 1350/900 pipe in Zlín Louky

Comments are closed

A renovation of a heavily damaged pipe leading to the water treatment plant in city Zlín was realized in October 2016. Due to the high flow in the pipe (flow was ranging between 1000 m3/h and 2500 m3/h) the demands for pumping were very high. Use of 5 Sterling Q200 pumps ensured successful draining of the renewed sector and KAWO liner DN 1350/900 could have been installed. Liner was then cured using hot water. The reconstruction was held close to the river Dřevnice, which was the reason of a very careful flow management so that no contamination was introduced into the water.

Comments are closed.